Colli al Metauro is a 2.20 MWp ground-mounted photovoltaic plant built in Via Sacca, in the municipality of Colli al Metauro, in the province of Pesaro and Urbino. Solar Grid Parity managed the field works on the single-axis tracker system, coordinating structure assembly, module installation, electrical activities, and site operations. The project was carried through to plant commissioning, ensuring execution continuity, control of the operating phases, and completion of the planned activities.

Location: Colli al Metauro (PU)

Plant type: Single-axis tracker

Year completed: 2025

Tracker system

Installation of single-axis tracker structures, designed to follow the movement of the sun and optimize the plant's energy production.

Structure assembly

Assembly of metal components in the field, with checks on alignments, mechanical connections, and correct installation.

Module installation

Installation of photovoltaic panels on the trackers, following ordered operating sequences and precise checks during the assembly phases.

Field works

Management of electrical and operational field works, including preparations, connections, and activities required for plant connection.

Operational coordination

Organization of teams, vehicles, and daily activities to ensure continuity, safety, and regular site progress.

Commissioning

Support for the final control, completion, and technical start-up phases through to full plant operation.